Kaswa Chemical's.

Office:- House No- 299, Street No- 9, Samanabad, Faisalabad.



Home.
Product.
Careers.
Downloads
Pictures Gallery
FAQ's
Contact Us.


Water Treatment Service Report

Interviewed_____________________________ Date____________________________

Firm___________________________________________________________________

Address________________________________________________________________

Send Copies of Report to:___________________________________________________

cyan divider line

 Product  Dosage Rec.  Dosage Rec.  Dosage Rec.  Supply On Hand
         
         
         
         
         
         
         
         
         
         

cyan divider line

Results of Tests Conducted

Field Test                   Cont. Blow Manual Blow
Control Limits                       

S

A

M

P

L

E

 

P

O

I

N

T
                       
                       
                       
                       
                       
                       

cyan divider line

OPERATING DATA

  Boiler WT

STEAM LOAD___________PRESSURE________________FEEDWATER (DA) TEMP/PRESS_________/__________

% RETURNS____________FUEL TYPE_______________METHOD OF FEEDING - CONT_________ INTER________

 Cooling WT

TEMPERATURE DROP THROUGH TOWER degrees F______________________________

CIRCULATION RATE, GMP_______________________MAKEUP, GALLONS PER DAY______________

SYSTEM VOLUME___________________________________________

cyan divider line

 Comments on Existing System Conditions:______________________________________________________











cyan divider line

 ACCEPTED BY______________________________  DATE______________  SUBMITTED BY____________________________________
















Home Product Careers Downloads Pictures Gallery FAQ's Contact Us